CMU School of Drama


Monday, June 06, 2011

Design and Performance Specifications

Technical Direction Tidbits: "One of my PM class lectures discussed design specifications and that the buyer assumes the risk because they have specified the equipment. On the other side, if the buyer defines the performance desired, the contractor assumes more risk. An IT example was given where all of the IT parts were specified, but perhaps the system as a whole didn’t work well because of unforeseen conflicts.

No comments: