Basic PTM - Critical Path
I was wondering if every group's machine has to end in pressing a button or if only the last group?and then I say:
There doesn’t have to actually be a button for each group, but the final action for each group should be a motion that could press a button. Consequently the first action of each group should be something that is initiated by a motion that could be pushing a button.
Wednesday, February 02, 2011
Basic PTM - Estimating
Hi David,
[my partner] and I were wondering if there is a specific number we should use as our budget for building the rocket flat. The sheet doesn't list one, and we need it to calculate our consumable allowance for each unit element sheet.
Also, the sheet gives a technical drawing and an artistic one. The artistic drawing includes additional lighting elements; should those be included in our estimates?
David says:
You don't need to know the overall budget to apply a consumables allowance.
I had meant to give you an available budget though. Let's do this:
$500 MaterialsBuild from the tech drawing.
2 "crew", 2 days, 10 hours per day
1 "helper", 1 day, 4 hours
Tuesday, January 11, 2011
Basic PTM - Organizational Charts
I've been talking to some people in the class, and a few of them have said that the first part of the Theater Hierarchy Organizational Chart is supposed to be fancy and creative, but as far as I understand you basically wanted a clean looking version of what you wrote on the board.
David says:
Yes. Part one should just be a b-flat, normal depiction of the "prototypical regional" production department. You can spruce it up if you want I suppose, but the content and relationships should just be what was discussed and what was on the board.
Wednesday, March 18, 2009
Basic PTM - Assorted
David,No quiz this week. Comments from last week and this week will roll over into next week.
Do we still need to make comments this week for the News Week Quiz? I realize we do not have class this week, but are the comments still needed?
David-You should do whatever you think you need to do to properly represent the process. If you can do it on paper that's fine, if you need more dimensions that's fine too.
Are we expected to create a 3D "arts and crafts" type object for the second chart, or can we use different line styles to distinguish between hire/fire and "can't do my job without"?
Hi,People, this is the kind of crap that happens when you don't do a schedule. Lets extend the paperwork deadline to April 9.
I just wanted to clarify due dates for our next two assignments. Are both the organizational charts and the new assignment we got today on forms due on April 2? They both have the same date, so I was just checking that they are in fact both due that day.
Monday, March 02, 2009
Basic PTM - Calendar & Critical Path
For the Critical Path/Calendar assignments, you say assume (2) people, but we may have a third if necessary. Lets say we had budgeted for (4) on the Elements sheet. Should we alter the Elements sheet to reflect a maximum of (3) people, or just make that change on the Critical Path/Calendar and have the documents be out of sync? Basically, if we need to make a change, should we track changes backwards or not.You can, should you so choose to rejigger your original estimate to reflect no more than the 2(sometimes+1) people available for the calendar assignment in order to force consistent lin times. If you do so, you do not have to update the earlier assignment.
Or you can do nothing and have the assignments not match, they are being evaluated individually.
Friday, February 27, 2009
Basic PTM - Critical Path Assignment
I have a critical path question for you. On my estimating sheet, I combined the "cutacetate" and "install acetate" into one action because both took so little time. Should I count both these actions as one on my critical path?Either way.
Thursday, February 26, 2009
Basic PTM - Critical Path Assignment
I have a question regarding the critical path analysis and the scheduling. On the critical path analysis, do we need to differentiate which department is doing the work (since there are a few hand-offs) or should all of the tasks be put into a single pool and the predecessors be determined blind of what department is doing it? Or is this irrelevant because the entire crew is ourselves and a buddy?What do you need to do critical path? Label, Time to complete, Immediate Predecessor.
For the critical path assignment, should we assume we only have two people or is that only for the calendar?What do you need to do critical path? Label, Time to complete, Immediate Predecessor.
Monday, February 23, 2009
Basic PTM - Estimating
So we are confused about the support for the flat. two people think you said we need to account for building bracing (a-frame/jack), while two think you said to not account for any support. help?there will be something for it to lean against, you do NOT have to bid it in
Thursday, February 19, 2009
Basic PTM - Estimating Assignment
Do you want our element sheets etc. made in excel or will a simple table work?There is no requirement to use Excel.
Also, are we assuming that everything is being bought?
You do not have a stock of material to draw from.
Wednesday, February 06, 2008
Basic PTM - Estimating Project
Tuesday, February 05, 2008
Basic PTM - Estimating Assignment
Hi Dave,
A couple of us from Basic PTM class were confused about some of the elements of assignment one. Is the project summary sheet and description done by each group collectively? Or do we do those elements separately? Any info would be much appreciated!
Answer:
Each pair can turn in one set of paperwork with both names.
db