PPStudent: hi, i have a question, just wanted to double check something, there is a 10% contingency on the materials, is there any contingency on the labor hours?
PPInstructor: which assignment?
PPStudent: sorry, paints
PPStudent: on the summary sheet
PPInstructor: on an element sheet
PPInstructor: you have 5% for hardware and nothing for labor
PPInstructor: on a summary sheet
PPInstructor: you have 10% on both materials and labor
PPStudent: ok, thank you!
PPInstructor: np
No comments:
Post a Comment