Basic PTM - Critical Path Project

PathInALine (6:56:57 PM): i've found that my steps for my rocket flat do not make up the most interesting critical path
PathInALine (6:57:04 PM): right now my only steps consist of
PathInALine (6:57:28 PM): layout flats, cut list flats, cut wood, assemble flats, mount sockets, wire lights, paint flat
PathInALine (6:57:45 PM): which basically end up being one straight line
PathInALine (6:57:52 PM): nothing can really happen while something else is going on
PathInALine (6:58:29 PM): am i going to need to re-evaluate the project completely?
PathInALine (6:59:47 PM): and add...multiple steps?
PathInANet (7:20:44 PM): or break the "flats" into sub projects
PathInANet (7:21:06 PM): as likely one could be painting the first flats built while the others are being fabricated
PathInANet (7:21:30 PM): probably the electrical could be a little more specific too
PathInALine (7:23:40 PM): how so for the electrical
PathInALine (7:23:57 PM): (yeah definitely for breaking it up into flats though)
PathInANet (7:24:43 PM): there's probably a process there too, yes?
PathInANet (7:24:57 PM): things need to be prepped before they are installed
PathInALine (7:25:03 PM): i guess?
PathInANet (7:25:12 PM): doesn't have to happen that way, but could
PathInALine (7:25:35 PM): ok